This feasibility study of an addition
would more than triple the size of existing facility
to 62,000 square feet.
The project features a two story breezeway
with second story bridge, a 700-seat performance
hall, split level connection to cafeteria building,
cafe, pub, and two story atrium.
Daylighting and energy conservation are central
to the design. Existing cafeteria electric
boilers will be changed to gas with solar pre-heating.
Existing windows will be upgraded with low-E film.
Night flushing will improve cooling. Sun dial
"clock" tower and sun tracking in building
to highlight solar events to remind campus of
the big picture. Campus wide participation in
the programming and design was achieved with a
series of six design workshops conducted by AIM
Associates.
<···